Cisco Meraki MS150-48LP-4X Cloud-Managed 48-Port PoE+ Switch Uganda

Cisco Meraki MS150-48LP-4X 48-Port PoE+ Switch in Uganda

Equip your branch, campus or office network with the Cisco Meraki MS150-48LP-4X, a cloud-managed access switch featuring 48 Gigabit Ethernet access ports, four 10 Gigabit SFP+ uplinks and a shared 370W PoE power budget. It is designed for connecting workstations, access points, IP phones, cameras and other wired endpoints while simplifying administration through the Meraki dashboard. Physical stacking interfaces support resilient access-layer designs, subject to compatible hardware and configuration. The switch provides static routing capabilities and a dedicated management interface. Buyers should size PoE carefully: the 370W budget is shared across powered devices, so forty-eight endpoints cannot all draw 30W simultaneously. Confirm optics, rack conditions, subscription licensing and intended topology before ordering. FourTeck can help Uganda customers prepare a bill of materials and request pricing for the switch, compatible accessories and licensing. Availability, delivery estimates, warranty coverage and final commercial terms are confirmed in a written quotation. Contact FourTeck with your site location, required quantity, anticipated PoE loads and preferred licensing period for a tailored procurement proposal.

SKU: CISCO-MS150-48LP-4X-UGANDA Category:

Cisco Meraki MS150-48LP-4X Cloud-Managed 48-Port PoE+ Access Switch

The Cisco Meraki MS150-48LP-4X is a managed enterprise access switch for organizations requiring forty-eight Gigabit Ethernet connections, four 10 Gigabit SFP+ uplinks and centrally administered Power over Ethernet. Its 370W shared PoE budget can power suitable phones, wireless access points and cameras while the Meraki dashboard helps distributed network teams manage configuration and monitor health. This particular LP variant is best evaluated against the actual device power schedule rather than the number of connected ports alone.

For Uganda offices, educational institutions, clinics and multi-site organizations, the switch offers a practical way to consolidate access connectivity and power distribution in a standard 1U rack position. It is not a substitute for a high-capacity data-center core switch, and its uplink design should be assessed against expected traffic and resilience requirements. FourTeck can coordinate a model-specific quote covering the hardware, appropriate cloud subscription, optics and installation accessories.

Request a Uganda Procurement Quote

Procurement Facts at a Glance

Model
MS150-48LP-4X
Access interfaces
48 × 1GbE RJ45
Uplinks
4 × 10GbE SFP+
PoE budget
370W shared across access ports
Switching capacity
176Gbps
Stock and warranty
Confirm in formal quotation

Architecture and Operational Fit

This switch is intended for the access layer, where user devices and powered endpoints meet the campus distribution network. Its 48 copper Gigabit interfaces allow a single rack-mounted device to serve a substantial floor or wiring closet. Four SFP+ uplinks offer 10GbE paths to compatible aggregation equipment. The published switching capacity is 176Gbps and the platform provides two dedicated stacking interfaces with 80Gbps stacking bandwidth. These figures describe different aspects of the architecture and should not be added together to estimate application throughput.

Network planners should separate three sizing questions: how many endpoints need ports, how much aggregate PoE is required and how much uplink bandwidth is needed during busy periods. For example, a site with twenty IP phones, twelve cameras and eight access points may fit comfortably in the port count but still require detailed PoE calculations. Endpoint class, negotiated power allocation and startup demand can materially affect the total power reserved. Where the estimated load approaches 370W, select a higher-budget switch or distribute endpoints across multiple switches rather than relying on average consumption alone.

Business Outcomes

  1. Consistent access connectivity: Gigabit copper ports support everyday enterprise applications and wired endpoints.
  2. Operational visibility: Cloud-based administration reduces the need for routine on-site configuration visits where the dashboard and licensing are correctly provisioned.
  3. Uplink flexibility: Four 10GbE SFP+ interfaces allow designers to plan distribution links with suitable optics and cabling.
  4. Structured segmentation: VLAN planning and supported access controls help separate staff, voice, cameras and guest networks.
  5. Power consolidation: PoE reduces the need for separate local adapters on compatible devices, while retaining the need for UPS and power-budget planning.
  6. Scalable operations: Standardized templates and monitoring procedures can make multi-branch deployments easier to administer.

Technical Specification Ledger

ParameterMS150-48LP-4X
Copper interfaces48 × 1GbE RJ45
Optical uplinks4 × 10GbE SFP+
Management interface1 dedicated interface
Power deliveryUp to 30W per supported PoE port; 370W shared switch budget
Switching capacity176Gbps
Stacking2 ports; 80Gbps stacking bandwidth
Layer 3Static routing
AC input100–240VAC
Power load36.2W idle / 460.6W maximum per installation guide
Operating temperature0–45°C
Humidity5–95%
MountingIntegrated 1U rack mount

Configuration and Sizing Worksheet

Begin by listing every proposed endpoint, including spare ports for growth. Record device type, required Ethernet speed, expected and peak PoE demand, VLAN membership and physical patch-panel position. Sum the PoE allocations and retain an operational margin. Next, document the intended uplink topology: one or more distribution switches, fiber distance, SFP+ module requirements and redundancy objectives. Validate rack depth, airflow, ambient temperature and UPS runtime using the maximum electrical load rather than idle draw. Confirm the current Meraki license offering and its term with the quotation; hardware and subscription costs should be clearly separated in the purchase order.

Deployment Scenarios

Multi-Site Business Offices

A consistent access-switch model across branches can simplify inventory, remote troubleshooting and configuration governance. Each location should still be sized independently for port density, uplink availability and PoE demand.

Banking and Financial Services

Use controlled VLAN designs, documented change procedures, protected uplinks and access policies suited to the institution’s security requirements. Do not assume that switching hardware alone delivers regulatory compliance.

Education and Campus Networks

Classrooms, staff offices and wireless coverage zones may share a switch where traffic segmentation and power budgets are appropriately planned. Review timetable-driven peaks and future classroom expansion.

Government and Public-Sector Sites

Procurement teams should validate approved sourcing channels, license ownership, firmware governance, maintenance obligations and acceptance testing before deployment.

Engineering Deep Dive: Traffic and Uplink Design

The 176Gbps switching-capacity specification provides a useful platform reference, but real user experience depends on traffic distribution, endpoint link speeds, congestion and upstream capacity. The four 10GbE interfaces are especially important when many Gigabit endpoints share applications hosted elsewhere. Link aggregation and redundant topology decisions must match the capabilities of both ends of each connection. Design against actual oversubscription and failure-domain requirements rather than treating the nominal switching-capacity number as an application service-level guarantee.

Engineering Deep Dive: Cloud Operations

Meraki dashboard management can support centralized inventory, configuration review, alerting and troubleshooting. Teams should define administrator roles, account protection, licensing ownership and change approval before onboarding devices. Cloud-managed operation also means buyers must understand subscription entitlements and connectivity requirements. Confirm current licensing and support terms with Cisco or the authorized supply channel before committing to a deployment.

Engineering Deep Dive: Availability Planning

Physical stacking can simplify administration of compatible switches, but it does not eliminate all shared failure modes. Provide appropriate UPS protection, diverse uplinks where supported and tested recovery procedures. For critical sites, document what happens if a switch, fiber path, power source or upstream gateway fails. Do not describe the MS150-48LP-4X as having redundant hot-swappable internal power supplies without verifying that feature for the exact SKU.

Buyer Due-Diligence Checklist

Before requesting a purchase order, verify the precise model suffix, the 370W shared PoE budget, the 10GbE SFP+ uplink requirement, optic compatibility, stacking accessories, rack clearances and regional electrical provisions. Check licensing costs across the intended ownership period and confirm the license’s renewal responsibilities. Ask for warranty terms in writing, including any exclusions or advance replacement arrangements. Distinguish the product’s published hardware capabilities from services offered by the reseller or installer. Confirm whether configuration, staging, shipment and on-site installation are included or separately priced.

Uganda Procurement and Delivery

FourTeck accepts quote requests for deployments in Kampala, Entebbe, Jinja, Mbarara, Gulu and other Uganda locations. Share the delivery site, quantity, required licensing duration and desired deployment window so the commercial team can confirm sourcing and logistics. Stock status, shipping dates, duties, payment terms and warranty processing should be established in the issued quotation rather than assumed from this product page. For projects involving multiple branches, a consolidated bill of materials can reduce inconsistent accessory ordering and support staged rollout planning.

Regional Procurement Links

For cross-border purchasing and project coordination, visit FourTeck Uganda, FourTeck Kenya, FourTeck Africa, FourTeck UAE or FourTeck Kuwait. Regional pricing, import conditions and product availability require separate confirmation.

Related Switching Options

Compare the MS150-48LP-4X with other members of the MS150 family where port count or power budget differs. The MS150-48FP-4X offers a larger 740W PoE budget for denser powered-device deployments; the MS150-48T-4X suits sites that do not require PoE; the MS150-24P-4X is an option when fewer access ports are needed. Ask FourTeck to include compatible SFP+ transceivers, fiber patch cords, rack accessories and the appropriate subscription in a single reviewed bill of materials.

Technical Services and Acceptance

For a properly scoped project, request bill-of-materials validation, configuration planning, firmware-policy review, pre-shipment checks and acceptance-test documentation. Agree in advance which activities are included in the quote and which require a separate services agreement. A useful handover should identify management ownership, switch naming, VLAN assignments, uplink maps, PoE allocations and escalation contacts.

Frequently Asked Questions

Does the MS150-48LP-4X provide forty-eight PoE ports?

It provides forty-eight Gigabit access ports with a shared 370W PoE budget and a published 30W per-port power ceiling. The overall power budget is the practical limit: forty-eight devices cannot each receive 30W at the same time. Build a device-by-device power schedule before selecting this model.

Are the uplinks 1GbE or 10GbE?

The 4X model has four 10GbE SFP+ uplink interfaces. Verify the exact transceiver and cable selection for the distribution equipment and fiber plant. Do not substitute assumptions from the 4G model, which has a different uplink configuration.

Is a Meraki subscription needed?

Meraki cloud-managed deployments require appropriate licensing. Ask for an itemized quote showing hardware, licensing tier, duration, renewal responsibility and support entitlements. Do not assume that the switch hardware price includes the full desired subscription period.

Can the switch perform routing?

Cisco lists static routing for this MS150 variant. Evaluate the wider routing architecture before assigning it a distribution or core role. Sites needing advanced dynamic routing should confirm platform support and consider alternatives where necessary.

Can two switches be stacked?

The platform includes two stacking interfaces and published 80Gbps stacking bandwidth. Check supported stack membership, cables, firmware compatibility and topology requirements before purchasing accessories or defining resilience targets.

How should the UPS be sized?

Use the installation guide’s published maximum power-load figure of 460.6W as a key input, then account for other connected rack equipment, UPS conversion losses, battery aging and required runtime. Electrical planning should be reviewed by a qualified installer.

Can the switch support wireless access points and cameras?

Yes, provided each device’s Ethernet and power requirements are compatible and the combined PoE allocations stay within the 370W budget. Higher-power endpoints or large numbers of cameras may justify a 740W variant.

Is pricing or delivery guaranteed?

No fixed price or delivery promise is made here. FourTeck should confirm the current supply position, shipping destination, license terms, warranty and commercial conditions in a written quotation.

What information should accompany a quote request?

Provide the exact model MS150-48LP-4X, quantity, delivery city, expected endpoint mix, estimated PoE consumption, optic requirements, license duration and target installation date. Mention whether staging or implementation services are needed.

Plan Your MS150-48LP-4X Deployment with FourTeck Uganda

Request a model-specific proposal that accounts for your access-port count, powered endpoints, 10GbE uplinks, licensing and delivery requirements. A complete procurement review helps prevent undersized PoE budgets, missing optics and unexpected subscription costs.

Contact FourTeck for a Quote

Reviews

There are no reviews yet.

Be the first to review “Cisco Meraki MS150-48LP-4X Cloud-Managed 48-Port PoE+ Switch Uganda”

Your email address will not be published. Required fields are marked *

Scroll to Top